Case Study

Warehouse WiFi Survey Before Network Remediation

A site has scanner dropouts, roaming problems, or poor coverage in warehouse aisles and needs measured findings before changing AP placement.

Guangzhou · DongguanWiFi Site SurveyWarehouse / Manufacturing
WiFi survey equipment for warehouse wireless assessment
Project locationGuangzhou · Dongguan
Onsite scopeWiFi Site Survey
Delivered evidenceCoverage and signal-quality heatmaps

Project Context

City, scenario, and support need

The remote network team needs more than user complaints. They need floorplan-based evidence, heatmaps, and a prioritized fix list.

  • City: Guangzhou · Dongguan
  • Scenario: Scanner dropouts, roaming issues, coverage gaps, and AP placement review before remediation.
  • Related service: WiFi Site Survey
  • Anonymized project example. Customer names and project materials are disclosed only with approval.

Work Done

What happened onsite

GreenITService can collect floorplans, measure onsite with Ekahau-based workflows, identify coverage or capacity risks, and provide implementation-ready notes.

  1. Reviewed floorplans, target areas, device types, complaints, and survey goals
  2. Measured coverage, signal quality, channel use, roaming behavior, and capacity risks onsite
  3. Mapped findings to warehouse areas and business-critical zones
  4. Prepared a fix list, AP notes, and retest guidance

Delivered Records

What the remote team received

The implementation team receives heatmaps, AP notes, issue findings, and a prioritized fix list that can guide remediation work.

  • Coverage and signal-quality heatmaps
  • AP table and implementation notes
  • P0 / P1 / P2 remediation list
  • Retest guidance after changes

Project Evidence

Photos and records to support the story

Photos, report extracts, and project records help remote teams verify what happened onsite while protecting confidential information.

WiFi site survey equipment for warehouse assessment
Representative WiFi survey equipment used for onsite warehouse assessment.
WiFi survey report sample with heatmap and fix list
Sanitized example of a WiFi heatmap, AP table, and remediation record.

Project Records

What well-documented onsite work includes

Good project records give remote teams a reliable account of the onsite visit while protecting customer information and site confidentiality.

Clear project context

Document the site type, city, task, access conditions, and the purpose of the onsite visit.

Onsite confirmation

Return the useful details from the visit: work completed, photos, serial checks, labels, test notes, and open items.

Completion records

Provide the agreed ticket notes, report extracts, asset records, WiFi findings, certificates, or sign-off documents.

Customer confidentiality

Customer names, site details, photos, and project outcomes are shared publicly only when approved.

Related Service

Related onsite service

Review the onsite work, support options, records, and information to send before a visit.

Ekahau WiFi site survey equipment with laptop and tablet

WiFi Site Survey

WiFi Site Survey in China

GreenITService runs Active WiFi surveys and APoS (AP-on-a-Stick) surveys in China for warehouses, offices, retail sites, factories, and exhibition venues. We measure the real environment, validate proposed AP locations when required, and provide a clear fix list that implementation teams can use.

See how it works

FAQ

Common questions

Can GreenITService share named customer cases?

Yes, when the customer approves the disclosure. Approved information may include the city, scenario, onsite work, records, result, and supporting visuals.

What project records can be shared after approval?

Depending on the project, approved records can include the city, onsite task, completion notes, photos, report extracts, asset records, survey findings, or certificate evidence.

Next Step

Request a WiFi survey scope review

Tell us whether the site needs an Active WiFi Survey or an APoS Survey. We will review the floorplans, target APs, critical areas, equipment path, and report package before scheduling.

  • City, floorplans, survey area, AP model, antenna, and mounting height if known
  • User density, device types, current complaints, and success criteria
  • Managed equipment or rental request, plus heatmap, remediation, acceptance, and retest requirements